Trending
Scottish Scientist's Avatar

Scottish Scientist

@scotscientist

Independent Scientific Adviser for Scotland Renewable Energy Science Blogger https://scottishscientist.wordpress.com/

36
Followers
41
Following
185
Posts
10.07.2025
Joined
Posts Following

Latest posts by Scottish Scientist @scotscientist

Post image Post image

Lake Onslow was NOT the "path to 100% renewable energy" claimed but a wasteful diversion.

Dry years problem solved, more wind power, North Island pumped hydro – New Zealand 100% renewables without Onslow
scottishscientist.wordpress.com/2023/04/12/n...

14.03.2026 08:10 πŸ‘ 0 πŸ” 1 πŸ’¬ 0 πŸ“Œ 0
Post image

I could also highlight the need to TRIPLE NZ's wind power, building +2,400MW for a total of 3,600MW or thereabouts.

NZ also needs to TRIPLE the rate of building from where it is now ~133MW/year to 400MW/year to triple capacity in 6 years.

Stalling of wind farm building in 2010s left NZ behind.

12.03.2026 11:43 πŸ‘ 0 πŸ” 0 πŸ’¬ 1 πŸ“Œ 0
Post image

I am not here to debate LNG vs Onslow.

I am here to debate the pros of North Island intra-week storage vs the cons of Onslow inter-year storage.

NZ can keep its engineers as easily working on good infrastructure projects which increase wealth of the nation vs bad projects which impoverish.

"CoC"?

12.03.2026 11:37 πŸ‘ 0 πŸ” 0 πŸ’¬ 2 πŸ“Œ 0
Post image Post image Post image

Onslow pumped hydro is too big, too expensive and too stupid

Dry years problem solved, more wind power, North Island pumped hydro – New Zealand 100% renewables without Onslow
scottishscientist.wordpress.com/2023/04/12/n...

12.03.2026 11:06 πŸ‘ 1 πŸ” 0 πŸ’¬ 1 πŸ“Œ 0
Preview
New Zealand’s Battery Project: Onslow pumped hydro is too big, too expensive and too stupid Dry years problem solved, more wind power, North Island pumped hydro – New Zealand 100% renewables without Onslow New Zealand exports hydroelectric power from the South Island to the North Is…

The NZ media's unseemly rush to promote Bardsley and his Onslow folly.πŸ˜’

Dry years problem solved, more wind power, North Island pumped hydro – New Zealand 100% renewables without Onslow
scottishscientist.wordpress.com/2023/04/12/n...

11.03.2026 20:37 πŸ‘ 0 πŸ” 0 πŸ’¬ 0 πŸ“Œ 0
Post image Post image

Bardsley🀑 is not an expert in renewable energy grid design - I am. His Lake Onslow folly should be dismissed.

Dry years problem solved, more wind power (TRIPLED❌3️⃣), North Island pumped hydro – New Zealand 100% renewables without Onslow
scottishscientist.wordpress.com/2023/04/12/n...

11.03.2026 08:20 πŸ‘ 0 πŸ” 0 πŸ’¬ 0 πŸ“Œ 0
Post image

Again, Kiwis are getting side-tracked arguing about the pros & cons of fossil fuels instead of accelerating the snail's pace build out of renewable generation - wind power needs to be tripled +2,400 MW built, but there's no push from govt to do that.
scottishscientist.wordpress.com/2023/04/12/n...

11.03.2026 08:12 πŸ‘ 0 πŸ” 0 πŸ’¬ 0 πŸ“Œ 0
Post image

The published scientific grounds for dismissing inexpert Bardsley's 🀑 folly.

Onslow pumped hydro is too big, too expensive and too stupid.
Dry years problem solved, more wind power, North Island pumped hydro – NZ 100% renewables without Onslow.
scottishscientist.wordpress.com/2023/04/12/n...

11.03.2026 08:03 πŸ‘ 0 πŸ” 0 πŸ’¬ 1 πŸ“Œ 0

You missed that the month in September was a worse case than June and was used to update the model.

Once a decade freak weather conditions can be coped with by resorting to fossil fuel mothballed legacy generators or perhaps some demand management.

10.03.2026 15:30 πŸ‘ 0 πŸ” 0 πŸ’¬ 0 πŸ“Œ 0
Post image

It is ludicrous to suggest that if only we could somehow polish a design or the modelling that it could make any difference to 2 Tier Keir, Rachel from Accounts, Red Ed, Armitage, Stark Raving Mad etc,

All they can do is rearrange the deck-chairs before the ship hits the iceberg.

10.03.2026 15:15 πŸ‘ 0 πŸ” 0 πŸ’¬ 0 πŸ“Œ 0
Preview
World’s biggest-ever pumped-storage hydro-scheme, for Scotland? Location Click for a larger image The map shows how and where the biggest-ever pumped-storage hydro-scheme could be built – Strathdearn in the Scottish Highlands. Energy storage capacity The …

It's the Govt. of free-marketeers (Tories) or cap-in-hand trade unionists (Labour) which is not viable to fund & lead a national infrastructure project of the scale of Strathdearn.
A command economy scientist is needed - that's me, πŸ‘¨β€πŸ”¬it's not UK GOV.🀑
scottishscientist.wordpress.com/2015/04/15/w...

10.03.2026 15:05 πŸ‘ 0 πŸ” 0 πŸ’¬ 1 πŸ“Œ 0
Post image

Yes 9+TWh with Strathdearn 6.8TWh at concept stage.

Only a few of the smaller projects have developer, design and planning permission BUT funding to build remains illusive AFAIK.

The UK Gov is rearranging the deck chairs of UK pumped hydro so assume a timescale of WHEN DO THEY HIT THE ICEBERG?

10.03.2026 14:36 πŸ‘ 1 πŸ” 0 πŸ’¬ 0 πŸ“Œ 0
Post image

If you are curious about the "Off-grid daily usage Focus Table" - this table differs in that it removes the "peak demand" column which isn't useful in the context of a property off grid and applies a "max" warning to the daily usage column.

10.03.2026 11:34 πŸ‘ 0 πŸ” 0 πŸ’¬ 0 πŸ“Œ 0
Preview
Modelling of wind and pumped-storage power This Scottish scientist produced aΒ spreadsheet modelΒ of an electricity generating system composed primarily ofΒ wind turbines backed up with pumped-storage hydro-electricity schemes.Β Such modelling …

Asking about "Wind, solar, storage and back-up system designer"?
scottishscientist.wordpress.com/2017/07/14/w...
"derived from scientific computer modelling"
scottishscientist.wordpress.com/2015/04/03/s...
So no. The designer was benchmarked using a model scaled from real UK wind and demand data.

10.03.2026 11:26 πŸ‘ 0 πŸ” 0 πŸ’¬ 1 πŸ“Œ 0
Post image
10.03.2026 01:42 πŸ‘ 1 πŸ” 0 πŸ’¬ 0 πŸ“Œ 0
Post image

A UK 120GW peak demand grid would need no more than about 4 terrawatt-hours of pumped hydro storage for 100% renewable energy grid - and could get away with much less TWh if dispatchable backup power (biomass or last resort fossil fuels) was available.
scottishscientist.wordpress.com/2017/07/14/w...

10.03.2026 01:37 πŸ‘ 0 πŸ” 0 πŸ’¬ 0 πŸ“Œ 0
Post image Post image Post image

Beyond whom?
Labour's UK Gov may be happy with OFGEM rearranging the deck chairs on the Titanic of pumped hydro opportunities, but that is not "us" - at least it is not me.
scottishscientist.wordpress.com/2023/02/05/m...

10.03.2026 01:32 πŸ‘ 0 πŸ” 0 πŸ’¬ 4 πŸ“Œ 0
Post image

"a private consortium has applied for a fast-track consent to revive the scrapped pumped-hydro project at Lake Onslow"

That dinosaur - OnslowsaurusπŸ¦• - cannot be revived other than as a scam to embezzle the Reserve Bank of NZ.
scottishscientist.wordpress.com/2023/04/12/n...
#NZpol #NZenergy

09.03.2026 16:06 πŸ‘ 0 πŸ” 0 πŸ’¬ 0 πŸ“Œ 0
Post image

My "modelling shows renewable electricity can meet NZ’s future demand" too but without the Onslow folly.

Instead, build pumped hydro on the NORTH ISLAND for intra-week storage of 30GWh/3GW.
Triple wind power.

Let the market build solar & batteries.
scottishscientist.wordpress.com/2023/04/12/n...

06.03.2026 14:38 πŸ‘ 0 πŸ” 0 πŸ’¬ 0 πŸ“Œ 0
Preview
World’s biggest-ever pumped-storage hydro-scheme, for Scotland? Location Click for a larger image The map shows how and where the biggest-ever pumped-storage hydro-scheme could be built – Strathdearn in the Scottish Highlands. Energy storage capacity The …

Ah Strathdearn pumped hydro - at its maximum build size could store 6.8TWh.

If 10TWh was ever really needed, we could source another 3.2TWh at other sites.

scottishscientist.wordpress.com/2015/04/15/w...

05.03.2026 22:13 πŸ‘ 1 πŸ” 0 πŸ’¬ 0 πŸ“Œ 0
Post image

Wind energy matches NZ's seasonal energy demand better than solar.

Govt should build -
* triple wind power, 400MW/year for 6 years
* 30GWh/3GW of intra-week pumped hydro storage on the North Island

Let the market build -
* GW solar & batteries
scottishscientist.wordpress.com/2023/04/12/n...

05.03.2026 12:38 πŸ‘ 1 πŸ” 1 πŸ’¬ 1 πŸ“Œ 1
Preview
Modelling of wind and pumped-storage power This Scottish scientist produced aΒ spreadsheet modelΒ of an electricity generating system composed primarily ofΒ wind turbines backed up with pumped-storage hydro-electricity schemes.Β Such modelling …

"pumped hydro storage which is the natural complement to wind"
You got that right, Iron Economist.😁

Throw in a little solar power and biomass for backup power for difficult weather conditions and you have a UK renewable energy system to die for.
scottishscientist.wordpress.com/2015/04/03/s...

05.03.2026 12:21 πŸ‘ 0 πŸ” 0 πŸ’¬ 1 πŸ“Œ 0
Post image Post image Post image

So what's the hold up with building UK pumped hydro?
We have the sites - Scotland mostly but England and Wales too.

The problem is misgovernment, with Labour using the same clueless officials to rearrange the deck chairs on the Titanic.
scottishscientist.wordpress.com/2023/02/05/m...

05.03.2026 12:16 πŸ‘ 0 πŸ” 0 πŸ’¬ 1 πŸ“Œ 0
Post image

I don't think the UK will need 10 TWh any time soon, but 2 to 4 TWh of pumped hydro would be very useful for a 120GW peak demand grid.

Run your own numbers with this free tool.
scottishscientist.wordpress.com/2017/07/14/w...

05.03.2026 12:10 πŸ‘ 0 πŸ” 0 πŸ’¬ 1 πŸ“Œ 0
Post image Post image Post image Post image

πŸ”Ή Sites spotlight: Pumped Storage HydroelectricityπŸ”Ή

Week 4 of our Sites series focuses on Pumped Storage Hydro.

You can now explore live generation charts for all operational UK sites.

energydashboard.co.uk/sites

#UKEnergy #EnergyData #PowerGeneration

29.01.2026 11:23 πŸ‘ 2 πŸ” 1 πŸ’¬ 0 πŸ“Œ 0
Post image

Dry years problem solved, more wind power, North Island pumped hydro – New Zealand 100% renewables without Onslow
scottishscientist.wordpress.com/2023/04/12/n...

04.03.2026 15:28 πŸ‘ 1 πŸ” 0 πŸ’¬ 0 πŸ“Œ 0
Post image

Instead of building 230MW/year of new wind farms to meet the 2030 target.

Next Labour Govts -
* triple wind power, 400MW/year for 6 years
* 30GWh/3GW of intra-week pumped hydro storage on the North Island

Every Govt / market -
* GW solar & batteries
scottishscientist.wordpress.com/2023/04/12/n...

03.03.2026 07:33 πŸ‘ 0 πŸ” 0 πŸ’¬ 0 πŸ“Œ 0

Count me in, brother! ✊

03.03.2026 07:08 πŸ‘ 1 πŸ” 1 πŸ’¬ 0 πŸ“Œ 0
Post image

The UK could share our pumped hydro with the Netherlands - but we aren't building as much as we could or as fast as we should.

21.02.2026 16:32 πŸ‘ 2 πŸ” 0 πŸ’¬ 0 πŸ“Œ 0
Preview
Search for sites to build new pumped-storage hydroelectricity schemes Scroll down to β€œUpdate May 2025” for news The Global pumped hydro atlas has been released by the Australian National University’s 100% Renewable Energy Group. Using computer progr…

Ireland can use these free tools to find good sites for pumped hydro
scottishscientist.wordpress.com/2019/04/04/s...
and design a 100% renewable energy grid.
scottishscientist.wordpress.com/2017/07/14/w...
Or hire me with a budget of over Β£1 billion
scottishscientist.wordpress.com/about/

21.02.2026 16:23 πŸ‘ 2 πŸ” 0 πŸ’¬ 0 πŸ“Œ 0