New steps
Railings have been getting installed at the new Roach Point Bridge.
2 sets of steps have also gone in on the Fish Island side.
New steps
Railings have been getting installed at the new Roach Point Bridge.
2 sets of steps have also gone in on the Fish Island side.
The 🚲 side of Jake Russell Walk is open.
Some lingering barriers suggest it might not be permanent.
🚶diversion is still signed.
At Section I much further east, the westbound cycle track is being extended now that the island for the staggered crossing has been removed.
The🚶side of the relocated (sparrow) crossing is in use but the 🚲 side remains closed
Also at Junction 3, work is under way at the SE corner. The crossing island beside these works has been removed.
Along Romford Rd, the Richmond Rd modal filter at Junction 3 is also taking shape.
At Water Lane, the modal filter on the Louise Rd side looks nearly finished.
At the Redbridge end of Newham's C16, there are improvement works to the end of Capel Rd.
At Leyton Rd, work has now extended further south, beyond where C16 will turn heading east.
The cycle track going in on Carperters Rd to the south of Pool St looks wide enough to be two-way.
(Not too far from here, the long term road closure of Letts Rd is more lightweight now. For several months, signs here had mentioned it would be closed till 17th Mar🤞)
There's a little bit more of physical segregation now between 🚲 +🚶, beside the incoming crossing to Olympic Park Ave.
A look around the multiple works areas in Newham yesterday.
The Westfield Ave/International Way crossings are now marked.
Northbound cycle track towards Stratford International doesn't yet connect usefully back to the roadway.
@newhamcyclists.uk @raynoldchow.bsky.social @edmondchuihw.bsky.social
Upcoming nighttime closures as part of the Streatham Hill works.
Likely to signify the start of 'Stage 3' of the scheme.
@raynoldchow.bsky.social @edmondchuihw.bsky.social
Apparently some new C48 markings have landed in Lambeth in recent days.
Possibly indicates that C48 is intended to reach Norbury at some time in the future.
@edmondchuihw.bsky.social @raynoldchow.bsky.social
I know.
Similar things have happened before around London, e.g. Farringdon end of C11 got signed ~2 weeks before it got it's first extended closure.
There is one additional sign entering QEOP indicating how non-C25 cyclists can join C25 (from the roadway).
At the Hackney Marshes end, signs are mostly towards the Marshes.
In the opposite direction the route will presumably use one of the toucan crossings, but the relevant signs have yet to appear for that direction.
A first batch of new C25 signs have gone up, mostly in Hackney but a couple also creeping into Newham.
Wayfinding is for Stratford Westfield and Hackney Marshes.
@hackneylcc.bsky.social @newhamcyclists.uk @edmondchuihw.bsky.social @raynoldchow.bsky.social @liamduffy.dev @safecycleldn.bsky.social
At the C27/C37 meeting point, the C27 sign has now been updated to include the left turn for C37.
Turning in the opposite direction, the right turn is signed as C37 rather than C27.
@hackneylcc.bsky.social @edmondchuihw.bsky.social @raynoldchow.bsky.social
Tilloch St 'looks' like it's open to cyclists as far as the cycle stands lining the raised kerb at the east end.
Barnsbury LN is supposed to include a cycle route between Bridgeman Rd + Tilloch St.
They might remove/relocate some of the new cycle stand at Tillock St if a new raised crossing comes.
Works on Story St for the latest pocket park going in as part of the Cally Liveable Neighbourhood scheme.
Oops, Hackney Central Station.
One way to make a diversion, although unlikely that many would be tempted away from just making their way around the closed contraflow, if able.
Stanhope Place pavement work may be nearing completion.
Current planned road closure at Connaught Sq North.
There are some yellow markings in place for probably the most significant piece of the scheme - a cycle crossing which will allow a northbound connection from the incoming Westbourne Terrace cycle track(s) up to Little Venice and beyond.
www.westminster.gov.uk/place-shapin...
Works under way outside Homerton Station.
On the far side of the road, apparently there will be a daytime road closure tomorrow, although the sign there has migrated from a different location from last week.
Amhurst Rd is planned to have a 2 day closure in 2 weeks - Mare St to Kenmure Rd (pic 4).
There has been a relocation of the crossing location this week outside Pembury Tavern for the Amhurst Rd crossing, to make room for pavement/SuDS works.
At Pembury Circus, it looks las though a couple of the permanent crossings might soon be coming into use.
This would allow the left-turn cycle track to get completed.
@raynoldchow.bsky.social @edmondchuihw.bsky.social
Presumably it's still planned.
Ground also broken on Westbourne Terrace. Less clear if this work is for the permanent cycle scheme, but it probably is.